another busy afternoon, the frame has been welded up and boxed to give maximum strength, finally fitted and measured up to make sure that its all still square, finally its been welded in however i've left it open sided for the time being until the otherside is at the same stage, when it was tacked into place we whipped the axle off and checked that the mounts were level so that the axle didnt lean side to side, its more accurate with the axle off and to use a big spirit level accross the axle mounts rather than rely on the axle beam itself, whilst the axle was off i finished the welding and commenced to chopping the other side out, i'd already pre cut the frame parts out ready for fitting and i'm part way through 1st fitting now, hopefully by tomorrow the n/s will be at the same stage as the o/s ready for me to make new inner wing panels, on 1 of the photo's attatched you can see how many layers of steel have been put in over the years and why i'm chopping it all out